Rich and Jack reframe the bedroom window. |

|
Preparation for the addition includes inside AND outside work. |
The high ladder work needs to be done first. |

|
Stage 2 is the hot tub enclosure |

|
The tub needs to be tested BEFORE the work is done |

|
A great way to end a day of construction! |
|
 |
|
|
 |
|