| Home | Labor Day 2005 | 4th of July 2005 | Memorial Day 2005 | Formal Events | Kyle and Ryan | Around the House | Bernatovich Babes | Music | Sports | Vacation Photos | Past Events | Flying | JEEP | Pets | Recipes | Upcoming Events
Crocco Family Photo Album

Rich's Addition

Forms for the concrete floor of the addition.
concreteframe1.jpg
This will be the game room, with a pool table and darts, just off the living room.

Rich and Jack reframe the bedroom window.
richroom1.jpg
Preparation for the addition includes inside AND outside work.

The high ladder work needs to be done first.
richroom2.jpg

Stage 2 is the hot tub enclosure
richroom10.jpg

The tub needs to be tested BEFORE the work is done
richroom9.jpg
A great way to end a day of construction!

Even Jackie learns how to swing a hammer.
richroom3.jpg

Melly, Rich, and Jack
richroom8.jpg
The addition is almost done, with a little help from family!

Jack and Melly cutting plywood sheeting.
richroom5.jpg

The finished addition!
richroom13.jpg
The screen patio for the hot tub on the left, the movie/pool room on the right.

The finished movie/pool room.
richroom16.jpg
A big pulldown screen and a pool table are the focus of the new entertainment room.